Natural wood siding painted black with an open-air front patio and floor-to-ceiling windows on the main level and in both secondary bedrooms on the 2nd level. Grotto level includes a covered patio, and the primary bedroom on second level enjoys its own private patio off the back of the house. Estimated Completion Date: Winter 2022